GroupGSA Significatly Cuts Time and Costs in Model Production
Group GSA, a renowned design firm with offices in Sydney, Melbourne, Brisbane, The Gold Coast, Perth, Beijing, Shanghai, and Ho Chi Minh City, has successfully integrated Raise3D 3D printers from Bilby3D into its operations.
Known for their innovative designs, such as the award-winning North Fitzroy Library and Community Hub,
Group GSA offers multidisciplinary services in Architectural Design, Interior Design, Urban Design, Landscape Architecture, and Graphics.
Proposed Development in Existing Landscape
Challenges Faced
Prior to adopting in-house 3D printing technology, Group GSA relied on CGI fly-throughs and occasionally outsourced 3D prints for final display pieces.
This process was time-consuming and costly, with each outsourced model taking one to two weeks to produce.
The lack of rapid prototyping capability hindered their ability to iteratively develop and visualize design concepts efficiently.
Solution
To overcome these challenges, Group GSA adopted the Raise3D Pro2 Plus, provided by Bilby3D.
This decision was driven by the need to enhance their design process, allowing for quick and cost-effective production of 3D models.
The Raise3D Pro2 Plus has significantly reduced the time required to produce models, from weeks to mere hours, enabling more frequent and detailed client interactions.
Design Sketch and 3D Printed Model
Practical Applications
Client Visualization
Mauricio Fuentes, an architect at Group GSA, highlights the impact of 3D printing on client engagement.
"Clients find it much easier to visualize how the design fits into the surrounds; they can touch and see the design, providing another level of interaction. They get really excited."
The tactile nature of 3D models offers clients a clearer understanding of the design concepts, leading to more informed feedback and decisions.
Design Development
The integration of 3D printing into their design process has expanded the scope of what Group GSA can achieve internally.
Rohit Broka, National BIM/Digital Design Manager, explains that 3D printing has become an integral part of their workflow, allowing them to produce sample models of design options quickly.
This capability has been positively received by clients, who appreciate the ability to visualize design concepts more concretely.
Planning Site Layout Tile
Efficiency and Cost Savings
By bringing 3D printing in-house, Group GSA has significantly cut down on the time and cost associated with model production.
Models that previously took weeks to outsource are now created in approximately two days.
This rapid turnaround not only speeds up the design process but also reduces costs, allowing the firm to allocate resources more effectively.
Proposed Development in Existing Landscape
Conclusion
The adoption of the Raise3D Pro2 Plus by Group GSA has revolutionized their design process, enhancing their ability to develop and present designs to clients.
The speed, reliability, and versatility of the 3D printer have allowed them to produce detailed models in-house, facilitating better client interactions and more efficient project development.
Bilby3D's support has been instrumental in this transition, providing the necessary training and parts to ensure the long-term success of Group GSA's 3D printing capabilities.
With the Raise3D Pro2 Plus, Group GSA is well-equipped to continue delivering innovative and award-winning designs, with 3D printing now an essential tool in their arsenal.